High Temperature Aging Test Room XZHT-2500

Delivery term:The date of payment from buyers deliver within days
  • Price:

    Negotiable

  • minimum:

  • Total supply:

  • Delivery term:

    The date of payment from buyers deliver within days

  • seat:

    Beijing

  • Validity to:

    Long-term effective

  • Last update:

    2017-11-25 16:03

  • Browse the number:

    81

Send an inquiries
Company Profile
Dongguan Xinzhou Industrial Oven Co., Ltd
Contactaixin:

xinzhou-oven(Mr.)  

telephone:

Arrea:

Beijing

Address:

Building No. D, Nority Industrial Area, ChangAn Town, Dongguan, Guangdong, China (523000)

Website:

http://xinzhou-oven.christineawebmall.com/

Product details

Model Number: XZHT-2500 Brand Name: Xinzhou Key Specifications/Special Features: High temperature aging test machineSCO-4000-5000-2000Specification:Style:SCO-4000-5000-2000Test standard: GB2423.2-2001 (High temperature test method)
GJB360.8-87 (High temperature service life test)
Temperature range:10-+80

Constant temperature fluctuation:±1 (without load)

Temperature control precision: ±0.5 (without load)

Temperature uniformity:≤±3 (without load)

Hearting rage: ≥1/min

Inside size: W4000xL5000xH2000 (WxDxH)mm (with single box)
Outside size: 4580x5140x2680 (WxDxH)mm

Control system: installing the controller made in Taiwan which is digital display and output with SSR.

Noise:
<75dB

Cooling method: by wind

The maximum power consumption: 30kW

Test condition:
A:Equipment environmental temperature is 5-35 degree Celsius, humidity: ≤85%RH
B:Barometric pressure ordinary pressure


Main performance index:
  • Humiture range:
  1. Temperature: 25 -70 degree Celsius
  2. Humidity: 60% RH-90% RH.
  • Header control precision:
  1. Temperature: +-0.1-+-0.5 degree Celsius
  2. Humidity: +-0.5-+-2.5 %RH
Header analysis precision:
  1. Temperature: 0.01 degree Celsius
  2. Humidity: 0.1% RH.
Warm-up time: about 45 minutes from normal temperature to 70 degree Celsius.
Cooling time: about 45 minutes from 70 to 25 degree Celsius.



Equipment work environment
  1. Power supply configuration: 380V±10%, 50Hz, 3 phase with 5 electric wires, rate: 35 KVA.
  2. Equipment environmental barometric pressure: 86.0-106.0Kpa
  3. Equipment environmental air humidity: <85%RH
Shipping Information:
  • FOB Port: Shenzhen
  • Lead Time: 20 - 30 days
Main Export Markets:
  • Asia